ONGOING AND COMPLETED PROJECTS
- BEYLİKOVA STATION WAREHOUSE ROAD
(COMPLETED)
On the one-way railway station warehouse road, many roadside equipment such
as rail circuit, switch engine, signal lamp, ATS system have been installed. In
addition, the cabling infrastructure of the station was modified, and copper and fiber
cables are laid. Finally, technical support was provided to the company and TCDD experts
in test commissioning related field.
- ESKİŞEHİR KÜTAHYA BALIKESİR (COMPLETED)
Preventive maintenance services for 59 network and catenary transformers in
the relevant line segment were carried out.
- INDIA TUNNEL PROJECT (COMPLETED)
Electromechanical designs of the ’Rishikesh Karanprayag New BG Rail Line’
project was carried out in a short time and the project was successfully completed by
obtaining local authority approvals as a result of site visits and site meetings.
- GAZİRAY
Consultancy and technical support services are provided for the assembly and
commissioning of electromechanical systems belonging to 4 stations and 3.6 km of tunnel.
The project continues at full speed and is planned to be completed in 2021.
- ISPARTA BURDUR GONCALI DENİZLİ NATIONAL SIGNALING
In the project consisting of 21 stations and 228 km line section, our
assembly and test commissioning consultancy services for signaling and telecommunication
systems are continuing rapidly. The project is planned to be completed in 2021.